Hi Together,
I want to model a FT, where I have a priority fault. Normally I would model with an AND gate, that a System A AND B has to fail, but in my case System A has to fail first, only then it is getting dangerous.
how can I model this in the FTA? In FT+ there is a "priority AND Gate" available.
Sven