Hello,
I have generated and saved lot of CutSet analysis for several FTA.
But i do not understand why I cannot update it all along the project/FTA updates?
Any advise?
Romain,
what exactly do you mean with "update"? You want to overwrite the saved cut set model?
Jan
Yes I have saved for all my FTA, one or several cut-set models. How can I re-generate (update) them while FTA has been updated?
I'm not aware of such a feature in the GUI, but if you are open for scripting, you could trigger the "Evaluate" fault tree method from inside a script, for all top events. See here (towards the end for an updated script).
If you don't have properties manually filled in your cut-set models, then it's probably easier to just generate new ones than updating (i.e. exactly replacing) the existing ones. You could modify the script to only have one latest model saved each.
Is that an approach, which helps you?
Regards,
Nils
Hello Romain,
the stored cutsets are never automatically overwritten due to the following reasons:
The recommendation is two give each stored cutset a significant name (e.g. including date&purpose of the calculation) and to remove manually cutsets which are outdated or not of any use anymore.
Best regards,
Eckhardt
So, I do not understand what is the right process/way to do for my FTA report. I want to generate with my own report (Birt) a FTA report (composed by all the FTA) with the associated cut sets.
Since FTA are updated regularly, how am i suppose to proceed to have that?
Thx
this is somehow mixing "report generation for multiple FTA including their cut sets" and "automatically update cut-set models", isn't it?
The report currently can only access the saved data from the project as they are at the time of the report generation. I think there is a discussion in the scripting forum that tackles the need to automatically calculate fault trees and store their cut-sets by a batch script. However, that is not related to reporting, so still 2 separate steps.