Hello,
Is there way to make the parameters "cyclesPerYear" and/or "calendarTime" of the phases in mission profile accept decimal values?
If it's not possible how would you solve this issue:
I have two system fleets which do not see the same mission profile. Any system can be in one the two fleets during the year (60%chance to be in fleet 1, 40% to be in fleet 2), the life profile I planned to use in Medini was a big life profile containing all the phases applicable to fleets 1 and 2 and multiply the number of hours/number of cycles by 0.6 and 0.4. This introduced a lot of decimal value in my profile.
Thank you,
Adrien Gérard