Hello,
We use the native field "Status" for Safety Goal and Safety Requirement tables to follow as much as possible the gap between two design increment.
Is there a possibility to compute the "status" field (native or customized) as follows ?:
- As soon as a modification is done on the requirement, the related "status" field switch automatically at a predefinied value (e.g. proposed).
Thanks